
California Bullet Train: Dangerous Faults Raise Costs
The infamous California High-Speed Rail may take an extra 15 years to build, travel underground through several very dangerous geologic faults, and rise in cost to $93 billion.

The infamous California High-Speed Rail may take an extra 15 years to build, travel underground through several very dangerous geologic faults, and rise in cost to $93 billion.

German engineering company Siemens is assembling a 50-foot, life-size model of California’s as-yet-unbuilt high-speed train on the steps of the state Capitol in Sacramento.